Estimated prices
The price list is a pre-call estimate: items are grouped by work type, unit and common ranges. The final quote depends on dimensions, access, materials and how ready the surface must be for finishing.
Niches, TV walls and boxes
Niches and boxes cover jobs where cables, AC lines, pipes, service access, TV walls and decorative lighting are the main planning points.
- unit
- One named detail or element with its agreed scope.
- m
- Length of the specified element or line, rather than wall area.
Why niches, TV walls and boxes are separate
Niches and boxes are rarely priced by square meters only: geometry, lighting, hidden services, access panels and clean joints matter. This price section separates simple covering from design-led or utility-heavy drywall work.
Drywall niches, TV walls and boxes, Drywall TV wall, Decorative drywall niches, AC pipe drywall boxes, Pipe and shaft drywall boxes, Electrical and communication drywall shafts, LED strip preparation.
- A pipe box and a TV wall are different levels of complexity.
- Lighting, sockets and service access should be planned early.
- More corners and junctions mean more finishing work.
Send photos, dimensions or a short description. A quick call helps understand the construction type, rough budget range and whether an on-site survey is needed.
What to prepare before estimating Niches, TV walls and boxes
For Niches, TV walls and boxes, a useful quote starts with the real condition of the room: photos, dimensions, ceiling height, access, existing finish and expected result. This keeps the first price range close to the final estimate instead of turning it into a random number.
Drywall niches, TV walls and boxes, Drywall TV wall, Decorative drywall niches, AC pipe drywall boxes, Pipe and shaft drywall boxes, Electrical and communication drywall shafts.
- Send wide and close photos of the area.
- Add approximate dimensions and ceiling height.
- Note whether the final finish is paint-ready, acoustic or technical.
Read the price unit and work boundary together
Before comparing two price rows, check the unit and included work. A wall measured by area, a particular opening and a whole-plane paint job are different parts of a brief. The row’s real unit and note remain the reference; marketing names do not replace them.
Two scope examples illustrate the difference without new amounts: the same ceiling with a different paint boundary, or a wall with a doorway instead of a plain wall. Agree those changes before interpreting a range as the same finished result.
Use the work links above the table to open the relevant existing group and row. Category filters remain available. The calculator link on each price opens the same selected catalogue item, rather than a different job with a similar name.
The guide helps prepare a quote and leaves the existing approximate-price conditions intact. Final scope depends on the actual premises. No new calculator, delivery rate or neighbourhood surcharge is introduced.
Scroll the table horizontally to see all columns.
| Part or situation | What to define | Result boundary |
|---|---|---|
| Unit | Area, length, unit or package as stated | Unit in the selected catalogue row |
| Scope | Inclusions and clarifications | Current catalogue note |
| Calculation | The same selected item | Selected catalogue item |
- What ceiling work includes
- The scope of shared-wall insulation
- Wall-painting surfaces
- Calculate from existing price items
- Is the price list a final quote?
- No. Its existing approximate-estimate conditions remain.
- How should metre prices be compared?
- Use the same units, scope and result boundaries.
- Is another calculator needed?
- No. These links use the existing calculator and catalogue items.
