Drywall, soundproofing and painting

Drywall, soundproofing and painting

Nikolai and a small crew build partitions, ceilings and TV walls, soundproof rooms, and skim coat and paint apartments and offices. Photo estimate, site survey and a clear quote before work starts.

Who handles the workNikolai, portrait from his Midrag profileNikolai's Midrag profile

Nikolai handles the job personally, not as a random contractor directory

Photos and the task are checked first, then the survey, scope and quote are agreed. A small crew works on site, while junctions, finish quality and expectations stay under personal control.

One responsible person

Nikolai takes the request, explains options and remains the main contact for the work.

Site survey before pricing

Dimensions, substrate, height, access, sockets, lighting, AC and weak points are checked.

Quote before start

The quote separates work, materials, finish, limits and anything priced separately.

Realistic soundproofing advice

Soundproofing is not sold as 100% silence: real noise paths are checked first.

Core work

Choose the right service for the job

Customer reviews: Midrag and Easy

Midrag9.58/10
Nikolai's Midrag rating

130 customer reviews

Midrag profile, 3 October 2026
Check originals on Midrag
8/10Midrag
The low ceiling to hide the air conditioner in the kitchen and living room, including high-quality hidden openings in special sizes.Translated review excerpt

Nikolai came and was very helpful in solving the problem in the kitchen, but then we waited more than a month and a half for the work to be done. Finally, the quality of work is perfect.

ש. כ. בנימינה. · Midrag · Read on Midrag
9/10Midrag
Repair of drywall niches in a very high ceiling following a leak from the roof. The repair and painting of the living room required work with scaffolding. In addition, plastering works due to moisture from the windows and walls.Review summary

Following a roof leak, Nikolai repaired drywall niches and a high ceiling, then painted the living room. The customer highlighted his responsibility and the team's workmanship.

מוטי ל. · Midrag · Read on Midrag
10/10Midrag
Installation of a modular ceiling tile system.Translated review excerpt

Nikolai is a professional that I wish many were like him. Kind and pleasant, a true professional with a head on his shoulders who gives ideas and solutions...

אתי לם L. תל אביב. · Midrag · Read on Midrag
Services

Service categories

Start with the room problem, then choose the work

Send Nikolai the city, a few photos and approximate dimensions even if you do not have a specification yet. The right scope starts with what the room needs to do.

A new room or partition

Plan the door opening, electrical points, support for mounted items and the final paint surface before the boards go on.

Noise or echo

Neighbour noise calls for checking the transmission path. Echo inside the room calls for sound absorption. The two should not be quoted as the same job.

Walls and ceilings before paint

Check the substrate, joints, moisture and lighting to decide between local repair, a full skim coat and a drywall assembly.

Describe the result before naming a material

A photo of a finished wall is a useful reference, but it does not explain how the room must work. Start with the actual outcome: another bedroom, a cleaner ceiling line, space for hidden lighting, a wall that can carry a television, or a surface ready for paint. Each goal changes the framing, openings, electrical work and finish. If a partition needs a door, decide how it will open and what furniture must clear it. If the project is a TV wall, locate sockets and cable paths before the boards close. A useful first conversation is about use and constraints, not only square metres of drywall.

Identify the sound problem before ordering soundproofing

Speech through a shared wall, footsteps from above and echo in a home office require different approaches. A new wall lining may help with one transmission path while leaving a door, ceiling junction or service shaft untouched. A ceiling treatment intended to absorb echo should not be sold as a cure for impact noise from upstairs. Describe what you hear, when it happens and where in the room it is strongest. Photos of the entire room, including doors, windows, sockets and air conditioning, help reveal the practical limitations. The purpose of this step is to avoid paying for the wrong assembly.

Plan partitions, ceilings and finishes in the right order

A partition needs a door position, fixing points for heavy items, electrical routes and a decision about privacy between rooms. A suspended ceiling needs clear height, a lighting plan, access to equipment and coordination with any air conditioning work. Finishing starts with the condition of the substrate: damp patches, loose plaster and moving cracks cannot be corrected by paint alone. When several trades are involved, agree on the sequence before work begins. Close boards only after concealed services and backing are checked; finish joints before primer; inspect the surface under the intended lighting before accepting the final coat.

Request a quote you can actually compare

Send the city, approximate dimensions, wide photos, a short description of the room and the result you want. Mark any door, lighting cove, access hatch, heavy fixture or unusual corner. Ask for the proposed frame and boards, insulation if relevant, joint treatment, primer, painting, protection of the occupied home and cleanup to be described separately. A price per square metre is difficult to compare when one offer includes electrical preparation and the other stops at bare boards. If an item is outside the scope, make that explicit before scheduling the work. The site calculator can help organise quantities, but an on-site assessment may change the final scope.

Check the finished work against the agreed scope

Inspect corners, joints, openings, door operation and the position of sockets or lights. View walls and ceilings in the lighting they will actually receive; grazing light makes surface differences easier to see. Confirm that service hatches still open and that any moved equipment works as intended. For acoustic work, ask what assembly was installed and which sound paths remain outside the project. A finished surface can look excellent while an untreated doorway still leaks sound, so appearance and function deserve separate checks. A few clear photos and measurements in the first WhatsApp message are enough to start a useful discussion with Nikolai.

About us

Drywall, soundproofing and painting in Israel

What NikoGips does

One crew handles drywall, common soundproofing systems, skim coat and painting in Israel. The goal is simple: choose the actual job, such as a partition, ceiling, wall lining, service box, TV wall, wall soundproofing, ceiling soundproofing or finish, and contact directly by phone or WhatsApp.

Drywall: partitions, walls and ceilings

Drywall work covers layout changes, wall lining, suspended ceilings, niches, boxes and paint-ready preparation. A partition, wall cladding, lighting cove, curtain pocket and AC box are different jobs: they need different framing, layers, access details, fixing points and finish levels.

Soundproofing options

Most acoustic requests start with choosing a system for the noise source rather than adding decorative panels: neighbor walls, ceilings from above, quiet rooms, work rooms, studios, membranes, Rockwool and sealed weak points. The result depends on the room construction; acoustic ceilings remain a separate option when the issue is echo inside the room.

Where we work

The main service area is Haifa District, northern Sharon and the coast: Hadera, Caesarea, Or Akiva, Zikhron Yaakov, Binyamina-Givat Ada, Harish and Pardes Hanna. Projects in other areas of Israel are possible after clarifying scope, travel and schedule.

Services

Services for renovation, acoustics and finish work

Drywall work

Office drywall and finishing in Israel

Office partitions, meeting rooms, ceilings, acoustics, skim coat and painting. Scope, access, services and staged work planned before installation.

Drywall work

Drywall partitions in Israel

Drywall partitions for apartments, offices and commercial spaces: room division, doors, electrical points, backing and paint preparation.

Drywall work

Acoustic drywall partitions in Israel

Drywall partitions with mineral wool, double boards, sealing and stronger framing for home offices, bedrooms, clinics, studios and offices.

Apartment and office renovation

Apartment and office renovation in Israel

Nikolai's team handles agreed demolition, walls, drywall, ceilings, flooring, interior doors and finishing in apartments and offices. Scope and quote follow an inspection.

Drywall work

Drywall ceilings in Israel

Drywall ceilings in Israel: flat, suspended and multi-level systems for AC routes, wiring, recessed lights, LED coves, curtain pockets, access panels and clean paint finish.

Drywall work

Hidden LED lighting in drywall ceilings

Drywall coves for hidden LED lighting in Israel: light gap, profile, diffuser, driver, access panel, curtain pocket, AC coordination and glare-free finish.

Niches, TV walls and boxes

Drywall niches, TV walls and boxes

Drywall niches, TV walls and technical boxes in Israel: cables, AC routes, LED lighting, TV backing, equipment ventilation, access panels and clean finish.

Niches, TV walls and boxes

Drywall TV feature walls in Israel

A gypsum board TV wall planned around the screen: secure backing, hidden cables, sockets, niches, lighting and access to equipment. Scope is priced after checking the wall.

Soundproofing and acoustics

Wall and ceiling soundproofing

Wall, ceiling and room soundproofing in Israel: noise path diagnosis, decoupled framing, mineral wool, acoustic membrane, double boarding, sealing of sockets and junctions without promising total silence before inspection.

Prices

Estimated prices

Projects

Projects and work photos

Blog

Guides and practical notes

Replacing office ceiling tiles in Haifa: matching the panel, edge and grid: AI illustration for this guide; it is not a photograph of a completed project.
Replacing office ceiling tiles in Haifa: matching the panel, edge and gridOne damaged tile does not always require a new ceiling. Identify the panel, check the grid and compare a local replacement with a complete ceiling zone.
A low ceiling in a Hadera apartment: plan drywall without wasting room height: AI illustration for this guide; it is not a photograph of a completed project.
A low ceiling in a Hadera apartment: plan drywall without wasting room heightCompare repairing the existing ceiling, a local bulkhead and a full lining: measured height, lighting, air conditioning, windows, complete quotes and handover.
Renovating one room in Or Akiva while living at home: scope, access and handover: AI illustration for this guide; it is not a photograph of a completed project.
Renovating one room in Or Akiva while living at home: scope, access and handoverPlan surfaces, retained furniture, protected access, hidden defects, drying stages and a complete quote before renovating a single room in an occupied apartment.